This describes how to transfer the services carried out
in the active board to the standby board when the active board fails.
The ADMIN users, administrators, operators, users, and custom users
with related authorities can perform this operation.
Prerequisites
- The LMT runs normally.
- The communication between the LMT and the BSC is normal.
- The standby board is in position and works properly.
Context
When faults occur in the active board, you need to switch
over the active board and the standby board to transfer the services
carried out in the active board to the standby board, and thus to
ensure the proper running of the system.
CAUTION: - Be cautious when switching over a board. If the board switchover
fails, the related links will be broken and the dynamic service data
(not the configuration data) will be lost.
- Because the board switchover may affect the existing services,
switch over a board when the traffic volume is low, for example, early
morning.
- All the boards that work in active/standby mode can be switched
over. However, the LMT does not support the initialization of the
switchover on the standby board except the GOMU board. Before the
switchover, ensure that the standby board is in position and working
properly, and no major or critical alarm occurs.
Procedure
- Through GUI
- On the LMT, choose .
- In Figure 1, select Subrack No., Board Type, and Slot No., and then click Switch. A confirmation dialog box is displayed.
- Click Yes. A dialog box is displayed,
as shown in Figure 1.
Figure 1 Switching over a BSC board
- Click Cancel.
- Through MML
- Run the SWP BRD command on the Local Maintenance Terminal
to switch over a BSC board.