This describes how to detect the fault in the BTS by testing the running status of all boards through the LMT.
Prerequisites
- The LMT runs normally.
- The communication between the LMT and the BSC is normal.
- The communication between the BSC and the BTS is normal.
Procedure
- Through GUI
- Choose .
- As shown in Figure 1, set the Site, and then click Start. The results are displayed, as shown in Figure 1.
Figure 1 Testing a BTS
- Click Stop to end the test.
- Through MML
- Run the SWP BTSBRD command on the LMT to test the BTS boards.