BTS-Sent Rejects to the LAPD Setup Requests

Measurement Counter

L5103:LAPD_TX_REJ

Description

This measurement provides the number of REJ frames that the BTS L2 sends on LAPD Link.

The REJ frame is a monitoring frame, which means that the received I frame (information frame) is rejected. The REJ frame contains the serial number of the expected I Frame.

I frames are numbered in sequence. The BTS L2 has records for received and sent I frames.

Normally, the value of this counter should be 0. If the BTS receives an I frame with an unexpected number, it sends a REJ frame to the BSC, and this counter is incremented by 1.

If the physical uplink is disrupted, the measurement result cannot be sent to the BSC and the value of this counter does not increase.

Unit

Integer number or integer.

Measurement point

This counter is measured when the BTS L2 sends a REJ frame on LAPD Link.

Formula

This is an original counter without involving any formula.


Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.