PBM_STEPITPBM_STEPIT*
*



Contents  *



Index  *Topic Contents
*Previous Topic: PBM_SETSTEP
*Next Topic: Progress Bar Control Structures

PBM_STEPIT


PBM_STEPIT 
    wParam = 0; 
    lParam = 0; 

Advances the current position for a progress bar by the step increment and redraws the bar to reflect the new position. An application sets the step increment by sending the PBM_SETSTEP message.

When the position exceeds the maximum range value, this message resets the current position so that the progress indicator starts over again from the beginning.


Up Top of Page
© 1997 Microsoft Corporation. All rights reserved. Terms of Use.