Initial Configuration Scenario: BM/TC Separated, Built-in PCU

When the BM and TC are configured in different subracks and the built-in PCU is used, you need to follow the fixed procedures and methods to perform the BSC initial configuration.

Prerequisites

Procedure

  1. Configure the BSC (BM/TC separated).

    Mandatory. For details, see Configuring the BSC (BM/TC Separated).

  2. Configure the built-in PCU.

    Mandatory. For details, see Configuring the Built-in PCU.

  3. Configure the BTS.

    Mandatory For details, see Configuring the BTS.

  4. Configure the reciprocal relations between cells.

    Mandatory For details, see Configuring the Reciprocal Relations Between Cells.

  5. Back up the LMT local data.

    Mandatory For details, refer to Backing Up LMT Local Data.

  6. Activate the license file.

    Mandatory For details, see Activating the BSC License.

  7. Load the local configuration files.

    Mandatory For details, refer to Loading and Restoring the Local Data File.


Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.