Principles of Configuring the BSC Transmission (BM/TC Combined)

This describes the principles of configuring the BSC communication links and signaling links when the BM and TC are configured in the same subrack.

Subrack Communication Link

Semipermanent Link

A Interface E1/T1

SS7 Signaling Point

SS7 Signaling Link

Pb Interface E1/T1

You need to configure the Pb interface E1/T1 when BSC is configured with the external PCU.

Pb Signaling Link

You need to configure the Pb signaling link when the BSC is configured with the external PCU.

Each GMPS or GEPS can be configured with up to sixty-four 64 kbit/s Pb signaling links.

Gb Interface Link

For details on the principles of configuring the Gb interface links, see Principles of Configuring the Gb Interface Links.

Related tasks
Configuring the BSC Links (BM/TC Combined)

Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.