This describes how to add a PCU and configure E1 connections and signaling links on the Pb interface. These E1 connections and signaling links are responsible for the communication between the BSC and the PCU.
Adding a PCU
This describes how to add a PCU to process the PS services.
Configuring the Pb Interface E1/T1
This describes how to configure the E1/T1 on the Pb interface to establish the physical path between the BSC and the PCU.
Configuring the Pb Signaling Link
This describes how to configure a signaling link on the Pb interface. This link is responsible for the signaling transmission of PS service procedure control and Pb transmission resource management.